• Chengdu NMP recycling system

    Published on: 2024-04-18 17:00
    Read: 12


    Basic parameters and configuration:

    workmanship

    Positive electrode: waste heat recovery+high tower exhaust gas return air Negative electrode: waste heat recovery+condensation return air (exhaust gas direct discharge)

    recovery unit

    Design parameters

    Waste gas treatment capacity

    Positive pole: 106000Nm ³/ h. Negative electrode sleeve: 75000Nm ³/ h. Set

    Tail gas emission concentration

    ≤ 25mg/m ³

    NMP recovery rate

    ≥ 99%

    NMP recovery solution concentration

    ≥ 90%

    Design service life

    15 years

    Heat recovery efficiency

    ≥ 75%

    Share

    推荐

  • 0755-84232331
  • mailbox:s.s.d@tianruide.com
  • Back to top