雷竞技最新版app-雷竞技最新域名
Basic parameters and configuration:
workmanship
Positive pole: waste heat recovery+condensation return air+exhaust gas water washing direct discharge
recovery unit
Design parameters
Waste gas treatment capacity
Positive pole: 240000m ³/ h.
Tail gas emission concentration
≤ 25mg/m ³
NMP recovery rate
≥ 99%
NMP recovery solution concentration
≥ 85%
Design service life
15 years
Heat recovery efficiency
≥ 75%
Share