• 雷竞技最新版app-雷竞技最新域名

    Published on: 2024-03-08 15:11
    Read: 0


    Basic parameters and configuration:

    workmanship

    Positive pole: waste heat recovery+condensation return air+tail gas water washing direct discharge / Negative pole: waste heat recovery direct discharge

    recovery unit

    Design parameters

    Waste gas treatment capacity

    Positive pole: 130000m ³/h. Set
    Negative pole: 110000m ³/h. Set

    Tail gas emission concentration

    ≤ 25mg/m ³

    NMP recovery rate

    ≥ 99%

    NMP recovery solution concentration

    ≥ 85%

    Design service life

    15 years

    Heat recovery efficiency

    ≥ 70%

    Share

    推荐

  • 0755-84232331
  • mailbox:s.s.d@tianruide.com
  • Back to top