雷竞技最新版app-雷竞技最新域名
Basic parameters and configuration:
workmanship
Positive pole: waste heat recovery+condensation return air+tail gas water washing direct discharge / Negative pole: waste heat recovery direct discharge
recovery unit
Design parameters
Waste gas treatment capacity
Positive pole: 130000m ³/h. Set
Negative pole: 110000m ³/h. Set
Tail gas emission concentration
≤ 25mg/m ³
NMP recovery rate
≥ 99%
NMP recovery solution concentration
≥ 85%
Design service life
15 years
Heat recovery efficiency
≥ 70%