• 雷竞技最新版app-雷竞技最新域名

    Published on: 2024-03-09 15:11
    Read: 2


    Basic parameters and configuration:

    workmanship

    Positive pole: waste heat recovery+water washing direct discharge

    recovery unit

    Design parameters

    Waste gas treatment capacity

    Positive pole: 12000m ³/ h. 

    Tail gas emission concentration

    ≤ 25mg/m ³

    NMP recovery rate

    ≥ 99%

    NMP recovery solution concentration

    ≥ 80%

    Design service life

    15 years

    Heat recovery efficiency

    ≥ 70%

    Share

    推荐

  • 0755-84232331
  • mailbox:s.s.d@tianruide.com
  • Back to top