雷竞技最新版app-雷竞技最新域名
Basic parameters and configuration:
workmanship
Positive pole: high tower return air+tail gas water washing direct discharge / Negative pole: waste heat recovery+condensation return air+tail gas direct discharge
recovery unit
Design parameters
Waste gas treatment capacity
Positive pole: 156500m ³/ h. Negative electrode sleeve: 110800m ³/ h. Set
Tail gas emission concentration
≤ 25mg/m ³
NMP recovery rate
≥ 99%
NMP recovery solution concentration
≥ 90%
Design service life
15 years
Heat recovery efficiency
≥ 75%